GB300 & B300 capacity opening Q3.Join the waitlist

    Your racks. Our megawatts. Live in ~3 months.

    High-density colocation built for the Blackwell generation. GB300 NVL72, B300 and RTX PRO 6000, at densities legacy facilities can't touch.

    10sMW

    Per-customer blocks

    ~3mo

    Signature to energized

    NVL72

    Rack densities supported

    0L

    Water used for cooling

    Inside a Helios hall

    A data hall. Engineered as one.

    A factory-built Helios module. Power, cooling and compute, designed together before it reaches your site.

    1.5 MW IT loadA + B power480 × 198 in footprint
    Illustrative reconstruction · Internal layout varies by configuration.View module drawing
    Cost estimator

    Estimate your colocation cost.

    Choose a GPU, node count, and cooling method to estimate all-inclusive monthly colocation cost. Bringing your own hardware? Select "Other" and enter its power draw.

    nodes
    64 GPUs
    14,096
    Cooling
    Estimated power90 kW
    Estimated cost
    $15,680$17,920

    per month

    Liquid cooling · $175–$200/kW/month

    Includes power, cooling, networking, monitoring, and remote hands. Bare-metal access stays yours.

    Request a quote

    Estimate only. Final pricing follows a technical review.

    Power first. Everything else follows.

    We site next to clean generation, contract the megawatts long-term, and energize the land before a single module arrives. Your hall lands on power that already exists.

    Most colo is built for servers. Ours is built for AI factories.

    Liquid-cooled, NVL72-ready

    Direct-to-chip cooling runs full NVL72 racks with zero derating.

    Energized in ~3 months

    Power and equipment are secured before you sign. The date is in the contract.

    Renewable-backed megawatts

    Sited next to clean generation, on long-term power agreements.

    Blocks of 10s of MW

    Take a hall, not a cage. Expansion rights come built in.

    24/7 staffed, remote hands

    Staffed around the clock, with hyperscale-grade SLAs.

    Carrier-neutral fiber

    Diverse paths, neutral meet-me rooms, your choice of network.

    Four steps. About ninety days.

    Reserve

    Day 0

    Tell us your megawatt target and your date. We reply within 48 hours.

    Scope

    Week 1

    Our engineers spec power, cooling and network around your hardware.

    Build-out

    Week 2

    Fit-out begins at once. The land and equipment are already waiting.

    Energize

    Month 3

    Racks powered, validated and handed over. Yours to fill.

    Megawatts move fast here.

    Blocks are allocated in waitlist order. Claim yours.